Seohae Green Organic Sludge Hydrothermal Carbonization (HTC) Facility
Thank you for visiting the DRACO HTC facility at Seohae Green.
Facility Overview
- Project
- Seohae Green Organic Sludge HTC Facility
- Feedstock / Capacity
- Organic Sludge 50 tons/dayMax. 60 tons/day
- Process
- DRACO HydroThermal Carbonization (HTC)
- Key Equipment
- DRACO HTC, Filter Press
- Engineering / Construction
- BKT Co., Ltd.
- Expected Benefits
- Sludge Volume Reduction, Solid Fuel Production, Lower GHG Emissions
PROCESS FLOW
Process Flow
Tap a stage to see what it does and where it is in the 3D tour.
Stage 1 / 7
Hopper
Organic sludge is stored in the Hopper and pumped to the Pre-heating Tank. The plant treats 50 tons per day, up to 60 tons.
50 tons/dayMax. 60 tons/day
3D EQUIPMENT TOUR
3D Equipment Tour
The model is based on the installation drawings. Pipe routes and building shells are conceptual.
배치도
Draco HTC 운전 단계
드래그: 회전 · 우클릭/Shift 드래그: 이동 · 휠: 확대 · ←/→ 지점 · Space 재생
3D 모델을 만들고 있습니다…
예열탱크 · 반응기 2기 · 감압탱크 · 필터프레스
예열탱크 · 반응기 2기 · 감압탱크 · 필터프레스
Model based on installation drawings · 9 stops · process flow animation
Opens full screen on phones · about 1 MB of data